CENEC SERVICIOS S.A

CERTIFICACION CCNP Switch

CENEC SERVICIOS S.A

Curso
Presencial
100 Horas
  • Madrid
consultar precio

CERTIFICACION CCNP Switch

Descripción

OBJETIVOS DE LA ACCIÓN FORMATIVA
 
Que el alumno con la impartición de las clases teóricas y prácticas este preparado para rendir el Examen de certificación 642-813 SWITCH Exam Topics  
 
 
 
CONTENIDOS

 
 
MÓDULO.  Switch.
Implement VLAN based solution, given a network design and a set of requirements
  • Determine network resources needed for implementing a VLAN based solution on a network
  • Create a VLAN based implementation plan
  • Create a VLAN based verification plan
  • Configure switch-to-switch connectivity for the VLAN based solution
  • Configure loop prevention for the VLAN based solution
  • Configure Access Ports for the VLAN based solution
  • erify the VLAN based solution was implemented properly using show and debug commands
  • Document results of VLAN implementation and verification
 
Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
  • Determine network resources needed for implementing a Security solution
  • Create a implementation plan for the Security solution
  • Create a verification plan for the Security solution
  • Configure port security features
  • Configure general switch security features
  • Configure private VLANs Configure VACL and PACL
  • Verify the Security based solution was implemented properly using show and debug commands
  • Document results of Security implementation and verification
 
Implement Switch based Layer 3 services, given a network design and a set of requirements
  • Determine network resources needed for implementing a Switch based Layer 3 solution
  • Create an implementation plan for the Switch based Layer 3 solution
  • Create a verification plan for the Switch based Layer 3 solution
  • Configure routing interfaces Configure Layer 3 Security
  • Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
  • Document results of Switch based Layer 3 implementation and verification
 
Prepare infrastructure to support advanced services
  • Implement a Wireless Extension of a Layer 2 solution
  • Implement a VoIP support solution
  • Implement video support solution
 
Implement High Availability, given a network design and a set of requirements
  • Determine network resources needed for implementing High Availability on a network
  • Create a High Availability implementation plan
  • Create a High Availability verification plan
  • Implement first hop redundancy protocols
  • Implement switch supervisor redundancy
  • Verify High Availability solution was implemented properly using show and debug commands
  • Document results of High Availability implementation and verification
 

Ver más

Destinatarios

Haber cursado CCNA, formación que también impartimos en CENEC SERVICIOS S.A

Requisitos

Haber cursado CCNA, formación que también impartimos en CENEC SERVICIOS S.A

Metodología

La metodología de los cursos será presencial, participativa y práctica. Se suministrará material didáctico (un manual por asistente/curso/nivel). El instructor, en todo momento, modulara el ritmo y co

Lugar donde se imparte el curso

c/ Galileo 26

Objetivos

OBJETIVOS DE LA ACCIÓN FORMATIVA
Que el alumno con la impartición de las clases teóricas y prácticas este preparado para rendir el Examen de certificación 642-813 SWITCH Exam Topics

Promociones

Para la subvención por el crédito de la fundación tripartita ser trabajador en activo

Sí, me interesa

conocer todos los detalles, precios, becas, fechas y plazas disponibles

CERTIFICACION CCNP Switch